Demographics Survey

Image
Dear El Gouna family members, Hope you are having a good day!  Because we care about you and hope to better understand your relationship with El Gouna; we wish you can take this carefully made 4 minutes short survey. CLICK ON SURVEY LINK:   https://goo.gl/forms/zjBT5GeJHAPgbHFr1?hl=en  Please read the disclaimer on the first page of the survey. Thank you in advance for your time.   Customer Services Department El Gouna

Downtown Bridge V2

Image
No sooner had El Gouna completed the downtown bridge connecting the downtown plaza with the pedestrian zone, that complaints started to be heard: it was too steep for pedestrians, it was ugly, it was unnecessary. Cars were seen driving underneath it slightly confused, unsure of which direction to take.   Fast forward one month, and Orascom have completed engineering changes to the bridge, transforming into a version 2. This time, a more pleasant and functional structure.  All of a sudden, the ramp up to the bridge is less steep, smoother and more gradual. Gone are the horizontal wooden anti-slip traction treads (unnecessary now as the slope is less steep).  The wood on the bridge is of better quality.  Moreover, the bridge was made wider.  As a result, the bridge height will only allow a maximum height of a 2.3m vehicle underneath. That would be fine for a minibus. Larger buses will not be permitted to pass. A n elevated median, (made of tyre ripping jagged rock!), physica

Marina Hill Project Works

Image
Kindly be informed that in order to develop the infrastructure of the Marina Hill project, some works (including drilling works) will take place on the road of the duty free shop starting  from Thursday, June 30th, 2018  until approximately July 25th , 2018 . Please note that there will be a well-lit parking lot up the Marina Hill for all the cars during the time of construction. As per attached map, during the above mentioned period, the duty free shop road will be only a “one way road” to access the marina. We sincerely apologize for the inconvenience that may occur during the time of the works and thanking you for your kind understanding and support. Respectfully yours, Customer Services Department El Gouna

Downtown Bridge Closure

Image
Kindly be informed that due to the adjustment of the downtown bridge, the tunnel will be closed as of June 19th , till Friday, June 29th, 2018.  Please be notified that cars will not be allowed to use the parking spaces in the B.TECH area, as the new bridge will be installed between 9:00 PM and 11:00 AM the next morning. As for the access to El Kafr Area, kindly use the existing alternative road behind Arena Inn Hotel.  Thanking you for your kind understanding and support. Customer Services 

Construction Halt Over Eid-Al-Fitr Holiday

Image
Dear El Gouna Homeowners, We hope this notice finds you all well. Kindly be informed, that  all construction works should be stopped  from Thursday, June 14 th , 2018 till Monday, June 18 th , 2018 , due to the upcoming public holiday and events happening in El Gouna. Please note that, no materials/workers will be allowed to enter El Gouna during this period. Thanking you for your kind understanding and support. Customer Service Department El Gouna Tel : 16650